We have just returned from the site, and it is still gonna take at least a couple of hours to restore the normal supply. Because the fault was in underground cable, so far only the actual spot could be located and the cable replacement work has just started.
The site is next to Panchsheel society (towards Galleria market) and team is still working to fix the problem.
Seeing this situation, I feel happy that at least we had uninterrupted power backup since yesterday evening otherwise life would have been very difficult in this weather :)
Regards,
Ishan Mishra
On Sat, May 26, 2012 at 7:38 PM, Gurpreet Singh <gurpreet.kohli@gmail.com> wrote:
Thanks Ishan for the update. Lets hope we don't have to spend another night sweating out without ACs!Gurpreet Singh--On Sat, May 26, 2012 at 6:33 PM, Ishan Mishra <ishan.mishra@gmail.com> wrote:
I just called the maintenance office and I was told by Ashu Agarwal that power supply will be provided by 9 PM. The work at the fault site, which is near Panchsheel society.. GOD knows which side :(, is still going on and the SDO confirmed over the phone that he will leave tonight only after restoration of power supply.Regards,Ishan--On Sat, May 26, 2012 at 4:55 PM, Aijaz Ahmed <ahmedaijaz1@gmail.com> wrote:
4:50 PM, and still no electricity in Mascot.
- I called Maintenance in the morning and was told there is a cut from CRPCL.
- Went to Galeria at around 11:30. Found there was no cut and electricity was there since early morning in the market place.
- When i confronted CSK, i was told that only Crossing has power, rest all of the societies are cut off.
- Now it turns out to be a Mahagun only thing.
God save Mascotians.-Aijaz919 - MilanoOn Sat, May 26, 2012 at 12:47 PM, Ishan Mishra <ishan.mishra@gmail.com> wrote:
I went to maintenance office and same update has been given to me as well with the recovery expected by 3 PM :(. They also confirmed that the issue is only for societies on Mahagun's side (probably Gaur City) and the supply in rest of the crossings is normal.Regards,Ishan--On Sat, May 26, 2012 at 11:18 AM, Gurpreet Singh <gurpreet.kohli@gmail.com> wrote:
Had to visit Maintenance personally to know the updates on power situation, and it has been told to me that the 11KV cable from CRCL to Mahagun has been damaged by some JCB work last evening and the same is being repaired at the moment.Its expected to be resumed by 1 pm however could take upto 4 pm as well.Thanks,Gurpreet Singh--On Sat, May 26, 2012 at 10:52 AM, amit vikram singh <amitvikramsingh@gmail.com> wrote:
Upendra singh just confirmed that their is fault in mahagun cable.
Normal power will restored after 1:00 pm.
On 5/26/12, amit vikram singh <amitvikramsingh@gmail.com> wrote:
> i have also checked and my friend confirmed that they have power since
> early morning.
> I have called upendra singh (estate manager csk) and informed him same.
>
> On 5/26/12, Gurpreet Singh <gurpreet.kohli@gmail.com> wrote:
>> I have come to know from couple of my friends living in GH-7 that they
>> have UNINTERRUPTED power all through last night when we faced powercut
>> since 10 pm (atleast as I returned to my flat around this time only) last
>> night!
>>
>> I have been trying to contact Maintenance guys since 5 am in the morning
>> and despite of trying 20-30 time no one is picking up the phone even when
>> my last try was at 9:30 am
>>
>> I really don't know what is going on in our society :(
>>
>> --
>> Gurpreet Singh
>> Mobile: 91-9810652486
>>
>
>
> --
> Regards
> Amit vikram singh
> +91 9873335809
>
--
Regards
Amit vikram singh
+91 9873335809
Gurpreet Singh
Regards,
Ishan Mishra
Regards,
Ishan Mishra
Gurpreet Singh
--
Regards,
Ishan Mishra
No comments:
Post a Comment